Dig past the drawing
Partway into a 350 sq ftgranite walkway, the ground under the dig turned out to be old backfill — soil we didn’t trust to hold a base. So we kept digging: 14″ down, to undisturbed soil, at our own cost. Nobody would have seen the difference for years. That was the point.