Field record — Stonework
Sheet A-515.01
- Town
- Georgian Bay
- Work
- Stonework
Flagstone, armour stone, pallets, topsoil, mulch and aggregate moved from the driveway drop to where the work actually is.
Sheet A-515Pallet forks, bucket and cargo box
Spring peak with a second run in fall, and any day a delivery lands.
Figures published by Bobcat for the Toolcat 5600. Width and height are measured against your own access before we commit to a date.
Sheet A-515 — The work
Material always gets dropped where the truck can reach, which is never where the work is. Pallet forks and a 2,000 lb cargo box move flagstone, armour stone, pavers, screenings, sand, base gravel, topsoil and mulch from the driveway to the back of the property — down a lane, around a cottage, across a lot the delivery truck was never getting into. Ten yards of mulch is a day with a wheelbarrow and an hour with the box.
Who buys this
Sequence on site — in order
Sheet A-515 — Operated hire — the machine with an operator
What a material-moving day costs
Quoted per job
Operator included
You are hiring the machine with him on it. He runs it, it stays on his insurance, and nothing about the work transfers to you.
Before we roll
HST shown as its own line. Price honoured as quoted.
Book the machine
Tell us the site and roughly what needs doing. We reply with a date and what it will take — hours, minimum and float shown before you commit.
No obligation — we reply within one business day.
How it is sold
By the hour, with a minimum and the float shown separately.
Distance from the drop to the work face, and how many times the route has to be run.
Also part of — Stonework
Our own stonework is the hardest carrying we do. The machine is why we can bid bigger stone than a crew with barrows.
Sheet A-515 — Typical job
The machine is new to the business this season, so there are no record photographs filed against it yet. What is on file is the finished stonework work it feeds — 4 records below.
Before we can book it — 04 questions
Sheet A-515 — Field records
These are finished stonework jobs from the book, photographed as they wrapped up. None of them were taken with the machine — it has not been here a full season yet. They are on this sheet because they are the work the machine is bought to serve: Our own stonework is the hardest carrying we do. The machine is why we can bid bigger stone than a crew with barrows.
Field record — Stonework
Sheet A-515.01
Field record — Stonework
Sheet A-515.02
Field record — Stonework
Sheet A-515.03
Field record — Stonework
Sheet A-515.04
Sheet A-590 — Book the machine
Tell us the site and roughly what needs doing. We reply with a date and what it will take — hours, minimum and float shown before you commit.
No obligation — we reply within one business day.